Their mission was to help customers build their dreams. Now, they had a dream of their own — to take production to the next level by improving efficiency, safety practices, and final part quality. They knew it would be a complex process, and they’d need to work with multiple vendors to make it happen. Luckily, their first call kicked off a series of events that led them to a Bluco® modular workholding solution.
Category: Case Study
Hostetler, A Case Study

Z Modular, A Case Study

Their goal was to deliver the golden trifecta to the construction industry: fast, affordable and very, very good. Find out how Bluco provided the missing ingredient for success.
Fairbanks Morse Engine, A Case Study

The goal of installing a robotic welding cell was to increase output. When results didn’t match up to expectations, the company turned to modular fixturing to overcome the challenges that were throttling their automation speed.
C.R. Onsrud, A Case Study

Read about how Bluco modular fixturing helped C.R. Onsrud moved their welding in-house and off of someone else’s timeline.
Detroit Truck Manufacturing

DTM needed a solution that allowed for different cab sizes, variable part shapes, and strict GD&T tolerancing.